G-ABCDVan's Aircraft RV-10 · build log
What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service
Chapters › Empennage

Empennage

25 %
Complete
0
Hours
4
Entries
SectionPlans ref.StatusEntriesHours
Receipt and inventory In progress 1 0
Vertical stabilizer Section 6 In progress 1 0
Rudder Section 7 In progress 1 0
Horizontal stabilizer Section 8 In progress 1 0
Elevators Section 9 Not started 0 0
Tailcone Section 10 Not started 0 0
Empennage attach Section 11 Not started 0 0
Empennage fairings Section 12 Not started 0 0

Latest in Empennage

All entries →
Rudder
2026-11-11 Empennage › Rudder

Rudder

See link below for images https://photos.app.goo.gl/CyYyptSVTKEYYZ4F9 Got the inspector around on 10th to inspect before closing up and he was ok with the work :-) Used t88 adhesive instead of tank sealant. Made a traili…

0 h
Vertical stab with rami av-520
2026-11-11 Empennage › Vertical stabilizer

Vertical stab with rami av-520

Photos here https://photos.app.goo.gl/prpf4Rw2KS4WUgXy9 Inspector came around on 10th oct and said it was ok to close up. Had a boo boo on one of the rivets and drilling out made the hole to big so ended up using a 5/32…

0 h
HS build to date
2026-11-11 Empennage › Horizontal stabilizer

HS build to date

Phtotos here https://photos.app.goo.gl/q5RoSNpb4RubGEUs5 On pause at the moment until I get hold of a long #30 drill to drill the middle hole in the 2 center nibs I missed. Also my rivet set isn't long enough to got to t…

0 h
Delivery
2026-07-01 Empennage › Receipt and inventory

Delivery

Delivery of the emp and  fuselage kits :-)

0 h