LN-RVXVan's Aircraft RV-10 · build log
What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Finished sheet metal basics project

2 November 2026 General › Sheet metal basics 2 h

Stopped working on this earlier because I messed up badly. But luckily I messed up a training project and not the real thing. In short, I was going to match drill the two sheets but I didn't check where the holes would land on the bottom sheet so I placed them so close to the edge that I wouldn't be able to dimple it. Super stupid mistake.

 

Continued today, and got to practice the rivet gun, the dimple squeezer and back riveting with the CARD2. I really like that tool, believe it will save me a lot of time.

It was good to practice all these techniques before I start working on actual plane parts. Would have gotten the Vans toolbox practice project if they had it, but too long lead times and substantial shipping cost if I order it separately.

To do: get a vacuum for the garage. A lot of metal shavings everywhere

Next step: find all the parts for the vertical stabilizer and prepare the remaining tools.

Comments

Write a new comment

A quick spam check runs in your browser – no puzzles, nothing sent to others.

← More from Sheet metal basics