6-3 steps 1-5
2026-11-12 Empennage › Vertical stabilizer

6-3 steps 1-5

Step 2 says "Final-Drill all the holes common to the  parts in the skeleton using a #30 size drill". I almost made a mistake here, by actually final drilling all the common holes as per the instructions. There are 2 hole…

3 h
NO PHOTO
2026-11-10 Empennage › Vertical stabilizer

Inspector visit

Visit from the EAA designated inspector for this project. Opted to hold off on any major and invasive modifications to the material before he had the chance to inspect my work so far. The spar caps discussed in a previou…

2 h
6-2 steps 6, 7 and 8, 6-3 steps 1 and 2
2026-11-05 Empennage › Vertical stabilizer

6-2 steps 6, 7 and 8, 6-3 steps 1 and 2

6-2 step 6: The plans says to use a 3/16" drill to match drill the holes, and to later use a #12 drill to final size them. Closest drill bits I have is 4.5mm and 5mm, I opted for the 5mm since its still smaller than the…

1.3 h
6-2 steps 2, 3, 4, 5 and 6
2026-11-05 Empennage › Vertical stabilizer

6-2 steps 2, 3, 4, 5 and 6

Last session ended because I did not have a 1/8" drill bit available. Posted a question on Vans Airforce, and got a tip to use a 3.1 mm drill bit instead. Closest I could find was a 3.2mm, but this is still smaller than…

3.5 h
6-2 step 2: Stuck already
2026-11-03 Empennage › Vertical stabilizer

6-2 step 2: Stuck already

I managed to get stuck at literally the first page of the instructions, step 2. It says Starting from the bottom of the spar, match-drill about every fourth hole of the rear spar  web into the spar caps using a 1/8" dril…

1 h
First real work at actual airplane parts
2026-11-03 Empennage › Vertical stabilizer

First real work at actual airplane parts

Started by locating all the parts listed on the front page for the vstab. Surprisingly few parts. Storing items as they were shipped and using the inventory to look at which subkit the parts are in helps finding the righ…

0.8 h
Finished sheet metal basics project
2026-11-02 General › Sheet metal basics

Finished sheet metal basics project

Stopped working on this earlier because I messed up badly. But luckily I messed up a training project and not the real thing. In short, I was going to match drill the two sheets but I didn't check where the holes would l…

2 h
NO PHOTO
2026-10-31 General › Sheet metal basics

Just time entry

1.5 h