LN-RVXVan's Aircraft RV-10 · build log
What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Empennage

10 entries

6-3 steps 1-5
2026-11-12 Empennage › Vertical stabilizer

6-3 steps 1-5

Step 2 says "Final-Drill all the holes common to the  parts in the skeleton using a #30 size drill". I almost made a mistake here, by actually final drilling all the common holes as per the instructions. There are 2 hole…

3 h
NO PHOTO
2026-11-10 Empennage › Vertical stabilizer

Inspector visit

Visit from the EAA designated inspector for this project. Opted to hold off on any major and invasive modifications to the material before he had the chance to inspect my work so far. The spar caps discussed in a previou…

2 h
6-2 steps 6, 7 and 8, 6-3 steps 1 and 2
2026-11-05 Empennage › Vertical stabilizer

6-2 steps 6, 7 and 8, 6-3 steps 1 and 2

6-2 step 6: The plans says to use a 3/16" drill to match drill the holes, and to later use a #12 drill to final size them. Closest drill bits I have is 4.5mm and 5mm, I opted for the 5mm since its still smaller than the…

1.3 h
6-2 steps 2, 3, 4, 5 and 6
2026-11-05 Empennage › Vertical stabilizer

6-2 steps 2, 3, 4, 5 and 6

Last session ended because I did not have a 1/8" drill bit available. Posted a question on Vans Airforce, and got a tip to use a 3.1 mm drill bit instead. Closest I could find was a 3.2mm, but this is still smaller than…

3.5 h
6-2 step 2: Stuck already
2026-11-03 Empennage › Vertical stabilizer

6-2 step 2: Stuck already

I managed to get stuck at literally the first page of the instructions, step 2. It says Starting from the bottom of the spar, match-drill about every fourth hole of the rear spar  web into the spar caps using a 1/8" dril…

1 h
First real work at actual airplane parts
2026-11-03 Empennage › Vertical stabilizer

First real work at actual airplane parts

Started by locating all the parts listed on the front page for the vstab. Surprisingly few parts. Storing items as they were shipped and using the inventory to look at which subkit the parts are in helps finding the righ…

0.8 h
NO PHOTO
2026-10-31 Empennage › Receipt and inventory

Finalized unboxing

Removed the last skins from the crate and stored them in the garage.

0.5 h
Nearly done with inventory
2026-10-30 Empennage › Receipt and inventory

Nearly done with inventory

Checked all items except for the larger skins, and subkit 3. Next steps: clean up the garage, and get some boxes for all the items.

0.8 h
NO PHOTO
2026-10-30 Empennage › Receipt and inventory

More inventory

Man, there is a lot of parts.

1.3 h
Received and opened crates
2026-10-30 Empennage › Receipt and inventory

Received and opened crates

Received and opened the crates. Log entry just to log time, and test the log feature. This thing is massive. Moved all the smaller items to the workshop for inventory, but need to come up with a plan for how to store the…

1.5 h