LN-RVXVan's Aircraft RV-10 · build log
What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

6-2 step 2: Stuck already

3 November 2026 Empennage › Vertical stabilizer 1 h

I managed to get stuck at literally the first page of the instructions, step 2. It says

Starting from the bottom of the spar, match-drill about every fourth hole of the rear spar  web into the spar caps using a 1/8" drill[...]

And later, in step 4: 

"With all the parts clecoed together, final-drill #30 the holes [...]

I ordered a complete tool kit for the RV-10 from Cleaveland Tools, but it did not include a 1/8" drill bit. They might expect the builder to already have some basic tools like drill bits, and normally that wouldnt be a problem, but imperial tools are not so easy to come by here in rural Norway. 

Posted a questions on Vans Airforce if it is OK To go straight to the #30 drill bit for the match drilling, but I suspect this might happen again so better to just find an online supplier that can send me the correct size. Annoying to get stuck so early on in the process.

My previous idea to use the belt sander to remove the excess material of the spar caps was not a good one. However, the band saw worked much better on the spar caps then they did on the thin sheet in the sheet metal basics project. The edge is not as straight as I would have wanted it, but I think it is good enough.

Comments

Write a new comment

A quick spam check runs in your browser – no puzzles, nothing sent to others.

← More from Vertical stabilizer