Empennage
| Section | Plans ref. | Status | Entries | Hours |
|---|---|---|---|---|
| Receipt and inventory | Complete | 4 | 4 | |
| Vertical stabilizer | Section 6 | In progress | 6 | 11.5 |
| Rudder | Section 7 | Not started | 0 | 0 |
| Horizontal stabilizer | Section 8 | Not started | 0 | 0 |
| Elevators | Section 9 | Not started | 0 | 0 |
| Tailcone | Section 10 | Not started | 0 | 0 |
| Empennage attach | Section 11 | Not started | 0 | 0 |
| Empennage fairings | Section 12 | Not started | 0 | 0 |
Latest in Empennage
All entries →
6-3 steps 1-5
Step 2 says "Final-Drill all the holes common to the parts in the skeleton using a #30 size drill". I almost made a mistake here, by actually final drilling all the common holes as per the instructions. There are 2 hole…
Inspector visit
Visit from the EAA designated inspector for this project. Opted to hold off on any major and invasive modifications to the material before he had the chance to inspect my work so far. The spar caps discussed in a previou…
6-2 steps 6, 7 and 8, 6-3 steps 1 and 2
6-2 step 6: The plans says to use a 3/16" drill to match drill the holes, and to later use a #12 drill to final size them. Closest drill bits I have is 4.5mm and 5mm, I opted for the 5mm since its still smaller than the…
6-2 steps 2, 3, 4, 5 and 6
Last session ended because I did not have a 1/8" drill bit available. Posted a question on Vans Airforce, and got a tip to use a 3.1 mm drill bit instead. Closest I could find was a 3.2mm, but this is still smaller than…
6-2 step 2: Stuck already
I managed to get stuck at literally the first page of the instructions, step 2. It says Starting from the bottom of the spar, match-drill about every fourth hole of the rear spar web into the spar caps using a 1/8" dril…