LN-RVXVan's Aircraft RV-10 · build log
What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

First real work at actual airplane parts

3 November 2026 Empennage › Vertical stabilizer 0.8 h

Started by locating all the parts listed on the front page for the vstab. Surprisingly few parts. Storing items as they were shipped and using the inventory to look at which subkit the parts are in helps finding the right parts. 

First order of business is to remove excess material from the spar caps. When doing the sheet metal basics project I tried a similar procedure with the band saw, which did not go very well. Planning to just grind away the excess material with a belt grinder instead, to make sure the band saw doesn't damage the parts.

The outside edge of the blue line is to be removed. Have a feeling that a belt grinder is more suitable than the band saw for this.
The area to the right of the blue line is to be removed. I believe a belt sander will give better results than the band saw. 

I am going to prime all interior parts. Have not set up the paint tent yet, but can still prepare all parts for final assembly before I need to paint them.

Basically all the parts for the vstab, except for some brackets and hinges. And the skin.

 

Comments

Write a new comment

A quick spam check runs in your browser – no puzzles, nothing sent to others.

← More from Vertical stabilizer