Elevators
Complete ✔ Approved · Section 9 · 7 entries · 25.5 h
+ Add a link
For example wiki articles, forum threads or suppliers' pages about this section.
Elevators done
Rolled the leading edges and installed the rod ends. Both elevators done.
Trailing edges
Bent the trailing edges with the hand seamer and a wooden bending brake. Took it slow, and both are straight.
Skins riveted
Back-riveted the stiffeners and riveted the skins to both elevators.
Counterweights
Drilled and fitted the lead counterweights. They are heavy! Torqued the screws and marked them with torque seal.
Trim tab
Built the trim tab on the left elevator. Fiddly bending of the tab skin, but it turned out straight.
Elevator skeletons
Assembled the spars, ribs and counterbalance arms for left and right elevator.
Elevator stiffeners
Cut, deburred and back-drilled the stiffeners for both elevators.
Inspector review
✔ ApprovedApproved by Demo Inspector on 21 February 2026, based on the online log.
Trim tab and counterweights look good. Approved from the log and photos.
-
Which primer are you using inside the elevators? Just so I know for the records.
-
Stewart Systems EkoPrime, two thin coats on scuffed and cleaned alclad.
Inspector task Approving is the inspector's task. As the owner you can approve too; the inspectors are notified.
Log entry inspections
Plans
No plans uploaded for this section yet.
Comments