Building LN-DMO

Van's Aircraft RV-10 · Demo/Dummy. [Four seats · amateur-built in a garage in Østfold]. Follow the build from the first rivet to the first flight.

20 %
Complete
271 h
Build hours
74
Log entries
CompleteIn progressNot started
NO PHOTO
2026-11-08 Fuselage › Mid fuse bulkheads

Mid fuse bulkheads started

Started on the mid fuse bulkheads to have something to do while the tank sealant cures. Deburred the spar carry-through parts.

3 h
NO PHOTO
2026-11-07 Wings › Fuel tank

Baffle ready

Sealed the fuel pickup and vent fittings. The left tank is ready to close; asked Kari for a look before I rivet on the baffle.

3.5 h ⧗ Awaiting inspection
NO PHOTO
2026-10-31 Wings › Fuel tank

Fuel pickup and vent

Installed the fuel pickup tube, the vent line and the fuel level sender in the left tank.

4 h
NO PHOTO
2026-10-17 Fuselage › Receipt and inventory

Fuselage kit arrived

The fuselage kit arrived today. Big crate! Inventory took most of the evening; short one bag of AN3 bolts, ordered from Van's.

6 h
NO PHOTO
2026-10-17 Wings › Fuel tank

First sealant

The ProSeal arrived. Sealed the ribs to the left tank skin. Messy, but going OK.

4.5 h
NO PHOTO
2026-10-03 Wings › Fuel tank

Tank parts prepared

Match-drilled the tank skins and the baffle. Deburred and dimpled everything. Ordered more ProSeal.

4 h
NO PHOTO
2026-09-23 Wings › Fuel tank

Tank ribs

Fluted the fuel tank ribs and fitted them inside the tank skins.

3.5 h
NO PHOTO
2026-09-19 Wings › Outboard leading edge

Leading edges on the wings

Attached the leading edges to the main spars. The wings are starting to look like wings.

2.5 h ⧗ Awaiting inspection