Fuel tank
In progress · Section 18 · 5 entries · 19.5 h
+ Add a link
For example wiki articles, forum threads or suppliers' pages about this section.
Baffle ready
Sealed the fuel pickup and vent fittings. The left tank is ready to close; asked Kari for a look before I rivet on the baffle.
Fuel pickup and vent
Installed the fuel pickup tube, the vent line and the fuel level sender in the left tank.
First sealant
The ProSeal arrived. Sealed the ribs to the left tank skin. Messy, but going OK.
Tank parts prepared
Match-drilled the tank skins and the baffle. Deburred and dimpled everything. Ordered more ProSeal.
Tank ribs
Fluted the fuel tank ribs and fitted them inside the tank skins.
Inspector review
Not approvedReview requested on 7 November 2026:
Left tank is ready to close. Could you look at the sealant fillets on the baffle and the fuel pickup before I rivet the baffle on?
-
I can come by on Saturday the 14th before noon to look at the tank.
Inspector task Approving is the inspector's task. As the owner you can approve too; the inspectors are notified.
Log entry inspections
Plans
No plans uploaded for this section yet.
Comments