Main spar
Complete ✔ Approved · Section 13 · 4 entries · 15 h
+ Add a link
For example wiki articles, forum threads or suppliers' pages about this section.
Spars primed
Primed the spars and set them aside. Asked Kari to visit and look at the spar bolt holes.
Nutplates
Riveted dozens of nutplates to the spars. Some of these are in tight spots and need the no-hole yoke.
Tie-down brackets
Drilled and tapped the tie-down brackets and fitted them to both spars.
Main spars
Cleaned up the main spars. Deburred the spar flanges and the rib attach holes.
Inspector review
✔ ApprovedApproved by Demo Inspector on 13 June 2026, based on an on-site visit.
Checked the spar bolt holes and the tie-down and rib attach rivets on site. Approved.
No comments or remarks yet.
Inspector task Approving is the inspector's task. As the owner you can approve too; the inspectors are notified.
Log entry inspections
Plans
No plans uploaded for this section yet.
Comments