Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service
Log › Wings › Main spar

Main spars

13 May 2026 Wings › Main spar 4 h ✔ Inspected

Cleaned up the main spars. Deburred the spar flanges and the rib attach holes.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 13 Jun 2026 13:10

Comments

← More from Main spar