Chapters › Empennage › Tailcone

Tailcone

Complete ✔ Approved · Section 10 · 8 entries · 33.5 h

+ New entry here

Inspector review

✔ Approved

Approved by Demo Inspector on 11 April 2026, based on an on-site visit.

Looked inside before the top skins went on: bulkheads, J-stringers and the bellcrank brackets. Approved.

No comments or remarks yet.

Inspector task Approving is the inspector's task. As the owner you can approve too; the inspectors are notified.

Log entry inspections

  • Tailcone bulkheads 2026-02-18 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • J-stringers 2026-02-22 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • Tailcone in the cradle 2026-02-28 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • Match-drilling 2026-03-07 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • Primer, round two 2026-03-14 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • Bottom skins riveted 2026-03-21 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • Side skins 2026-03-28 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit
  • Tailcone done 2026-04-04 ✔ Inspected by Demo Inspector · 2026-04-11 · on-site visit