Tailcone
Complete ✔ Approved · Section 10 · 8 entries · 33.5 h
+ Add a link
For example wiki articles, forum threads or suppliers' pages about this section.
Tailcone done
Top skins on and riveted. The tailcone is finished.
Side skins
Riveted the side skins. Asked for an inspection before the top skins close it up.
Bottom skins riveted
Riveted the bulkheads and the bottom skins. Bellcrank brackets installed and checked against the plans.
Primer, round two
Primed all the tailcone parts. A long day in the paint booth with the respirator on.
Match-drilling
Match-drilled everything to final size, then took it all apart again for deburring and dimpling.
Tailcone in the cradle
Built a cradle from plywood, then clecoed the whole tailcone together. It suddenly looks like an aircraft!
J-stringers
Clecoed the J-stringers to the bottom skins. Took a while to get them all to line up.
Tailcone bulkheads
Started the tailcone. Deburred and fluted the bulkheads, and edge-finished the J-stringers.
Inspector review
✔ ApprovedApproved by Demo Inspector on 11 April 2026, based on an on-site visit.
Looked inside before the top skins went on: bulkheads, J-stringers and the bellcrank brackets. Approved.
No comments or remarks yet.
Inspector task Approving is the inspector's task. As the owner you can approve too; the inspectors are notified.
Log entry inspections
Plans
No plans uploaded for this section yet.
Comments