Empennage attach
Complete ✔ Approved · Section 11 · 3 entries · 10 h
+ Add a link
For example wiki articles, forum threads or suppliers' pages about this section.
Elevators hung
Hung the elevators, set the control stops and safety-wired the bolts. All the empennage parts together for the first time.
VS and rudder fitted
Fitted the VS and hung the rudder. Rudder swings freely.
HS on the tailcone
Fitted the HS to the tailcone and measured the incidence and alignment several times before drilling the attach bolts.
Inspector review
✔ ApprovedApproved by Demo Inspector on 25 April 2026, based on an on-site visit.
Hinge bolts, cotter pins and control stops checked on site. Approved.
No comments or remarks yet.
Inspector task Approving is the inspector's task. As the owner you can approve too; the inspectors are notified.
Log entry inspections
Plans
No plans uploaded for this section yet.
Comments