Wings

50 %
Complete
90
Hours
23
Entries
SectionPlans ref.StatusEntriesHours
Receipt and inventory Complete 1 5
Main spar Section 13 Complete ✔ Approved 4 15
Wing ribs Section 14 Complete ✔ Approved 3 12.5
Rear spar Section 15 Complete ✔ Approved 2 7.5
Top wing skins Section 16 Complete 4 15
Outboard leading edge Section 17 Complete 4 15
Fuel tank Section 18 In progress 5 19.5
Stall warning system Section 19 Not started 0 0
Bottom wing skins Section 20 Not started 0 0
Aileron Section 21 Not started 0 0
Flap Section 22 Not started 0 0
Aileron actuation Section 23 Not started 0 0
Wing tip Section 24 Not started 0 0

Latest in Wings

All entries →
NO PHOTO
2026-11-07 Wings › Fuel tank

Baffle ready

Sealed the fuel pickup and vent fittings. The left tank is ready to close; asked Kari for a look before I rivet on the baffle.

3.5 h ⧗ Awaiting inspection
NO PHOTO
2026-10-31 Wings › Fuel tank

Fuel pickup and vent

Installed the fuel pickup tube, the vent line and the fuel level sender in the left tank.

4 h
NO PHOTO
2026-10-17 Wings › Fuel tank

First sealant

The ProSeal arrived. Sealed the ribs to the left tank skin. Messy, but going OK.

4.5 h
NO PHOTO
2026-10-03 Wings › Fuel tank

Tank parts prepared

Match-drilled the tank skins and the baffle. Deburred and dimpled everything. Ordered more ProSeal.

4 h
NO PHOTO
2026-09-23 Wings › Fuel tank

Tank ribs

Fluted the fuel tank ribs and fitted them inside the tank skins.

3.5 h