Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Inspections

3 sections awaiting review · 8 entries awaiting inspection · 1 open remark

Approving and remarks are the inspector's tasks, marked Inspector task . As the owner you can do them too; the inspectors are notified when you do.

Task list

Open remarks

  • Wings › Top wing skins
    Please show the replaced rivets near rib 9 with a photo, and I will come by to look at the top skins and the leading edges together. · Demo Inspector · 2026-08-17

Log entries awaiting inspection

2026-07-15 Wings › Top wing skins 4 h

Top skins match-drilled

Clecoed the top skins to the skeleton and match-drilled them.

Based on
Inspector task
2026-07-25 Wings › Top wing skins 4.5 h

Dimpling the top skins

Dimpled the top skins on the DRDT-2. Hundreds of dimples.

Based on
Inspector task
2026-08-15 Wings › Top wing skins 1.5 h

Two rivets replaced

Drilled out and replaced the two smiley rivets near rib 9 on the left wing. They look good now.

Based on
Inspector task
2026-08-19 Wings › Outboard leading edge 4 h

Leading edge ribs

Fluted the leading edge ribs and fitted them inside the skins.

Based on
Inspector task
2026-08-29 Wings › Outboard leading edge 4.5 h

Leading edges assembled

Clecoed the leading edges to the spars, match-drilled, then deburred and dimpled.

Based on
Inspector task
2026-09-12 Wings › Outboard leading edge 4 h

Leading edges riveted

Riveted the leading edges. Left one has the stall warning cut-out, which I'll finish later.

Based on
Inspector task
2026-09-19 Wings › Outboard leading edge 2.5 h

Leading edges on the wings

Attached the leading edges to the main spars. The wings are starting to look like wings.

Based on
Inspector task
2026-11-07 Wings › Fuel tank 3.5 h

Baffle ready

Sealed the fuel pickup and vent fittings. The left tank is ready to close; asked Kari for a look before I rivet on the baffle.

Based on
Inspector task

Recent decisions

EntryResultByWhen
Top skins riveted
Wings › Top wing skins
✖ Changes requested
Online log
Demo Inspector 2026-08-10
Rear spars
Wings › Rear spar
✔ Inspected
Online log
Demo Inspector 2026-07-18
Rear spar riveted
Wings › Rear spar
✔ Inspected
Online log
Demo Inspector 2026-07-18
Ribs straightened
Wings › Wing ribs
✔ Inspected
Online log
Demo Inspector 2026-07-04
Lightening holes
Wings › Wing ribs
✔ Inspected
Online log
Demo Inspector 2026-07-04
Ribs on the spars
Wings › Wing ribs
✔ Inspected
Online log
Demo Inspector 2026-07-04
Main spars
Wings › Main spar
✔ Inspected
On-site visit
Demo Inspector 2026-06-13
Tie-down brackets
Wings › Main spar
✔ Inspected
On-site visit
Demo Inspector 2026-06-13
Nutplates
Wings › Main spar
✔ Inspected
On-site visit
Demo Inspector 2026-06-13
Spars primed
Wings › Main spar
✔ Inspected
On-site visit
Demo Inspector 2026-06-13
Empennage fairing
Empennage › Empennage fairings
✔ Inspected
Online log
Demo Inspector 2026-05-09
Rudder bottom fairing
Empennage › Empennage fairings
✔ Inspected
Online log
Demo Inspector 2026-05-09
Empennage complete
Empennage › Empennage fairings
✔ Inspected
Online log
Demo Inspector 2026-05-09
HS on the tailcone
Empennage › Empennage attach
✔ Inspected
On-site visit
Demo Inspector 2026-04-25
VS and rudder fitted
Empennage › Empennage attach
✔ Inspected
On-site visit
Demo Inspector 2026-04-25
Elevators hung
Empennage › Empennage attach
✔ Inspected
On-site visit
Demo Inspector 2026-04-25
Tailcone bulkheads
Empennage › Tailcone
✔ Inspected
On-site visit
Demo Inspector 2026-04-11
J-stringers
Empennage › Tailcone
✔ Inspected
On-site visit
Demo Inspector 2026-04-11
Tailcone in the cradle
Empennage › Tailcone
✔ Inspected
On-site visit
Demo Inspector 2026-04-11
Match-drilling
Empennage › Tailcone
✔ Inspected
On-site visit
Demo Inspector 2026-04-11