Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Empennage fairing

22 April 2026 Empennage › Empennage fairings 3 h ✔ Inspected

Trimmed the fiberglass fairing to fit around the HS and VS. Lots of sanding.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 9 May 2026 10:45

Comments

← More from Empennage fairings