Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Rudder bottom fairing

29 April 2026 Empennage › Empennage fairings 2.5 h ✔ Inspected

Fitted the rudder bottom fairing and drilled for the tail light.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 9 May 2026 10:45

Comments

← More from Empennage fairings