Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Leading edges on the wings

19 September 2026 Wings › Outboard leading edge 2.5 h ⧗ Awaiting inspection

Attached the leading edges to the main spars. The wings are starting to look like wings.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

This entry is waiting for an inspector.

Based on
Inspector task

Comments

← More from Outboard leading edge