Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Tool kit arrived

23 August 2025 General › Tools and workspace 3 h

The tool kit from Cleaveland came today. Unpacked everything, sorted the dimple dies and rivet sets in a drawer cabinet and labelled all the drawers.

Also ordered a second set of clecos. Everyone on the forums says you can never have too many.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Comments

← More from Tools and workspace