Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

VS spars

13 September 2025 Empennage › Vertical stabilizer 3.5 h ✔ Inspected

Deburred the front and rear spars and the spar doublers. Match-drilled the rear spar doubler to the spar per 6-2.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 11 Oct 2025 14:20

Comments

← More from Vertical stabilizer