Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Deburring and dimpling

24 September 2025 Empennage › Vertical stabilizer 3.5 h ✔ Inspected

Deburred every hole and dimpled the skin with the C-frame. Machine countersunk the spar flange where the plans call for it.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 11 Oct 2025 14:20

Comments

← More from Vertical stabilizer