Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

VS riveted

4 October 2025 Empennage › Vertical stabilizer 4.5 h ✔ Inspected

Riveted the skeleton, then the skin. My wife bucked for the hard-to-reach ones. Only two rivets drilled out. The VS is done!

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 11 Oct 2025 14:20

Nice result. Remember to keep the bottom rib holes open for the attach step.

Comments

← More from Vertical stabilizer