Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

HS spars

12 November 2025 Empennage › Horizontal stabilizer 3.5 h ✔ Inspected

Started on the horizontal stabilizer. Deburred and match-drilled the front spar and the reinforcement angles.

+ Add a YouTube video

Paste the link from the video's Share button. The entry itself is not changed.

Inspection

✔ Inspected by Demo Inspector · 28 Dec 2025 13:40

Comments

← More from Horizontal stabilizer