Empennage
43 entries
Match-drilling
Match-drilled everything to final size, then took it all apart again for deburring and dimpling.
Tailcone in the cradle
Built a cradle from plywood, then clecoed the whole tailcone together. It suddenly looks like an aircraft!
J-stringers
Clecoed the J-stringers to the bottom skins. Took a while to get them all to line up.
Tailcone bulkheads
Started the tailcone. Deburred and fluted the bulkheads, and edge-finished the J-stringers.
Elevators done
Rolled the leading edges and installed the rod ends. Both elevators done.
Trailing edges
Bent the trailing edges with the hand seamer and a wooden bending brake. Took it slow, and both are straight.
Skins riveted
Back-riveted the stiffeners and riveted the skins to both elevators.
Counterweights
Drilled and fitted the lead counterweights. They are heavy! Torqued the screws and marked them with torque seal.
Trim tab
Built the trim tab on the left elevator. Fiddly bending of the tab skin, but it turned out straight.
Elevator skeletons
Assembled the spars, ribs and counterbalance arms for left and right elevator.