Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Empennage

43 entries

+ New entry
NO PHOTO
2026-01-06 Empennage › Elevators

Elevator stiffeners

Cut, deburred and back-drilled the stiffeners for both elevators.

3 h ✔ Inspected
NO PHOTO
2025-12-20 Empennage › Horizontal stabilizer

HS done

Final rivets on the rear spar. The HS is complete and on the shelf next to the VS.

3 h ✔ Inspected
NO PHOTO
2025-12-13 Empennage › Horizontal stabilizer

HS skins riveted

Riveted the skins to the skeleton. The rear spar goes on last; used the long yoke squeezer where I could.

5 h ✔ Inspected
NO PHOTO
2025-12-06 Empennage › Horizontal stabilizer

Front spar riveted

Riveted the front spar assembly. Asked Kari to have a look at the HS-1004 rivet line before I close it.

3.5 h ✔ Inspected
NO PHOTO
2025-11-29 Empennage › Horizontal stabilizer

Deburr, dimple, prime

A long session of deburring and dimpling, then primer on all the inside parts.

4 h ✔ Inspected
NO PHOTO
2025-11-22 Empennage › Horizontal stabilizer

Skins on the skeleton

Clecoed both skins on and match-drilled everything. Checked the twist on the table: within 1 mm tip to tip.

4.5 h ✔ Inspected
NO PHOTO
2025-11-16 Empennage › Horizontal stabilizer

HS ribs

Fluted and fitted the nose ribs and the main ribs. Lots of parts on this one.

4 h ✔ Inspected
NO PHOTO
2025-11-12 Empennage › Horizontal stabilizer

HS spars

Started on the horizontal stabilizer. Deburred and match-drilled the front spar and the reinforcement angles.

3.5 h ✔ Inspected
NO PHOTO
2025-11-08 Empennage › Rudder

Rudder done

Blind riveted the leading edge and installed the rod ends. Rudder complete.

2.5 h ✔ Inspected
NO PHOTO
2025-11-05 Empennage › Rudder

Leading edge rolled

Rolled the leading edges with a broom handle and duct tape. Took three tries on the top part, but it closes nicely now.

3 h ✔ Inspected