Empennage
43 entries
Elevator stiffeners
Cut, deburred and back-drilled the stiffeners for both elevators.
HS done
Final rivets on the rear spar. The HS is complete and on the shelf next to the VS.
HS skins riveted
Riveted the skins to the skeleton. The rear spar goes on last; used the long yoke squeezer where I could.
Front spar riveted
Riveted the front spar assembly. Asked Kari to have a look at the HS-1004 rivet line before I close it.
Deburr, dimple, prime
A long session of deburring and dimpling, then primer on all the inside parts.
Skins on the skeleton
Clecoed both skins on and match-drilled everything. Checked the twist on the table: within 1 mm tip to tip.
HS ribs
Fluted and fitted the nose ribs and the main ribs. Lots of parts on this one.
HS spars
Started on the horizontal stabilizer. Deburred and match-drilled the front spar and the reinforcement angles.
Rudder done
Blind riveted the leading edge and installed the rod ends. Rudder complete.
Leading edge rolled
Rolled the leading edges with a broom handle and duct tape. Took three tries on the top part, but it closes nicely now.