Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Empennage

43 entries

+ New entry
NO PHOTO
2026-05-02 Empennage › Empennage fairings

Empennage complete

Fairings done. The empennage is complete; on to the wings!

2 h ✔ Inspected
NO PHOTO
2026-04-29 Empennage › Empennage fairings

Rudder bottom fairing

Fitted the rudder bottom fairing and drilled for the tail light.

2.5 h ✔ Inspected
NO PHOTO
2026-04-22 Empennage › Empennage fairings

Empennage fairing

Trimmed the fiberglass fairing to fit around the HS and VS. Lots of sanding.

3 h ✔ Inspected
NO PHOTO
2026-04-18 Empennage › Empennage attach

Elevators hung

Hung the elevators, set the control stops and safety-wired the bolts. All the empennage parts together for the first time.

3.5 h ✔ Inspected
NO PHOTO
2026-04-12 Empennage › Empennage attach

VS and rudder fitted

Fitted the VS and hung the rudder. Rudder swings freely.

3 h ✔ Inspected
NO PHOTO
2026-04-08 Empennage › Empennage attach

HS on the tailcone

Fitted the HS to the tailcone and measured the incidence and alignment several times before drilling the attach bolts.

3.5 h ✔ Inspected
NO PHOTO
2026-04-04 Empennage › Tailcone

Tailcone done

Top skins on and riveted. The tailcone is finished.

4 h ✔ Inspected
NO PHOTO
2026-03-28 Empennage › Tailcone

Side skins

Riveted the side skins. Asked for an inspection before the top skins close it up.

4 h ✔ Inspected
NO PHOTO
2026-03-21 Empennage › Tailcone

Bottom skins riveted

Riveted the bulkheads and the bottom skins. Bellcrank brackets installed and checked against the plans.

4.5 h ✔ Inspected
NO PHOTO
2026-03-14 Empennage › Tailcone

Primer, round two

Primed all the tailcone parts. A long day in the paint booth with the respirator on.

5 h ✔ Inspected