Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Empennage

43 entries

+ New entry
NO PHOTO
2025-11-01 Empennage › Rudder

Trailing edge riveted

Riveted the trailing edge in three passes, a little at a time. String test shows it is straight within 1 mm over the whole length.

4 h ✔ Inspected
NO PHOTO
2025-10-22 Empennage › Rudder

Trailing edge wedge

Glued the trailing edge wedge with ProSeal and clamped it between two straight angles to cure for a week.

3 h ✔ Inspected
NO PHOTO
2025-10-18 Empennage › Rudder

Stiffeners riveted to the skins

Back-riveted the stiffeners to the skins on a steel plate. Back-riveting gives beautiful flat heads.

3.5 h ✔ Inspected
NO PHOTO
2025-10-12 Empennage › Rudder

Rudder skeleton

Assembled the rudder spar, ribs and horn brace. Match-drilled the skins to the skeleton.

4 h ✔ Inspected
NO PHOTO
2025-10-08 Empennage › Rudder

Rudder stiffeners

Cut and deburred the rudder stiffeners from the angle stock. Back-drilled them to the skins.

3 h ✔ Inspected
NO PHOTO
2025-10-04 Empennage › Vertical stabilizer

VS riveted

Riveted the skeleton, then the skin. My wife bucked for the hard-to-reach ones. Only two rivets drilled out. The VS is done!

4.5 h ✔ Inspected
NO PHOTO
2025-09-27 Empennage › Vertical stabilizer

Primer

Scuffed and cleaned all the internal parts and primed them with rattle-can primer. Let it cure overnight.

3 h ✔ Inspected
NO PHOTO
2025-09-24 Empennage › Vertical stabilizer

Deburring and dimpling

Deburred every hole and dimpled the skin with the C-frame. Machine countersunk the spar flange where the plans call for it.

3.5 h ✔ Inspected
NO PHOTO
2025-09-20 Empennage › Vertical stabilizer

VS skin match-drilled

Clecoed the skin to the skeleton and match-drilled all holes to final size. Took it apart again for deburring and dimpling.

4 h ✔ Inspected
NO PHOTO
2025-09-16 Empennage › Vertical stabilizer

VS ribs fluted and fitted

Fluted the ribs until the holes lined up with the spar flanges. Clecoed the skeleton together and it sits square on the bench.

3 h ✔ Inspected