Build log
74 entries
HS on the tailcone
Fitted the HS to the tailcone and measured the incidence and alignment several times before drilling the attach bolts.
Tailcone done
Top skins on and riveted. The tailcone is finished.
Side skins
Riveted the side skins. Asked for an inspection before the top skins close it up.
Bottom skins riveted
Riveted the bulkheads and the bottom skins. Bellcrank brackets installed and checked against the plans.
Primer, round two
Primed all the tailcone parts. A long day in the paint booth with the respirator on.
Match-drilling
Match-drilled everything to final size, then took it all apart again for deburring and dimpling.
Tailcone in the cradle
Built a cradle from plywood, then clecoed the whole tailcone together. It suddenly looks like an aircraft!
J-stringers
Clecoed the J-stringers to the bottom skins. Took a while to get them all to line up.
Tailcone bulkheads
Started the tailcone. Deburred and fluted the bulkheads, and edge-finished the J-stringers.
Elevators done
Rolled the leading edges and installed the rod ends. Both elevators done.