Build log
74 entries
Spars primed
Primed the spars and set them aside. Asked Kari to visit and look at the spar bolt holes.
Nutplates
Riveted dozens of nutplates to the spars. Some of these are in tight spots and need the no-hole yoke.
Tie-down brackets
Drilled and tapped the tie-down brackets and fitted them to both spars.
Main spars
Cleaned up the main spars. Deburred the spar flanges and the rib attach holes.
Wing kit inventory
The wing kit came today, and with it the two missing rivet bags from the empennage kit. Inventory complete; everything is there.
Empennage complete
Fairings done. The empennage is complete; on to the wings!
Rudder bottom fairing
Fitted the rudder bottom fairing and drilled for the tail light.
Empennage fairing
Trimmed the fiberglass fairing to fit around the HS and VS. Lots of sanding.
Elevators hung
Hung the elevators, set the control stops and safety-wired the bolts. All the empennage parts together for the first time.
VS and rudder fitted
Fitted the VS and hung the rudder. Rudder swings freely.