Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Build log

74 entries

+ New entry
NO PHOTO
2026-02-07 Empennage › Elevators

Trailing edges

Bent the trailing edges with the hand seamer and a wooden bending brake. Took it slow, and both are straight.

3 h ✔ Inspected
NO PHOTO
2026-01-31 Empennage › Elevators

Skins riveted

Back-riveted the stiffeners and riveted the skins to both elevators.

4.5 h ✔ Inspected
NO PHOTO
2026-01-24 Empennage › Elevators

Counterweights

Drilled and fitted the lead counterweights. They are heavy! Torqued the screws and marked them with torque seal.

3.5 h ✔ Inspected
NO PHOTO
2026-01-17 Empennage › Elevators

Trim tab

Built the trim tab on the left elevator. Fiddly bending of the tab skin, but it turned out straight.

4 h ✔ Inspected
NO PHOTO
2026-01-10 Empennage › Elevators

Elevator skeletons

Assembled the spars, ribs and counterbalance arms for left and right elevator.

4 h ✔ Inspected
NO PHOTO
2026-01-06 Empennage › Elevators

Elevator stiffeners

Cut, deburred and back-drilled the stiffeners for both elevators.

3 h ✔ Inspected
NO PHOTO
2025-12-20 Empennage › Horizontal stabilizer

HS done

Final rivets on the rear spar. The HS is complete and on the shelf next to the VS.

3 h ✔ Inspected
NO PHOTO
2025-12-13 Empennage › Horizontal stabilizer

HS skins riveted

Riveted the skins to the skeleton. The rear spar goes on last; used the long yoke squeezer where I could.

5 h ✔ Inspected
NO PHOTO
2025-12-06 Empennage › Horizontal stabilizer

Front spar riveted

Riveted the front spar assembly. Asked Kari to have a look at the HS-1004 rivet line before I close it.

3.5 h ✔ Inspected
NO PHOTO
2025-11-29 Empennage › Horizontal stabilizer

Deburr, dimple, prime

A long session of deburring and dimpling, then primer on all the inside parts.

4 h ✔ Inspected