Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Build log

74 entries

+ New entry
NO PHOTO
2025-08-31 General › General information

Read section 5

Read through section 5 twice: rivet callouts, edge distance, dimpling and how the plans are laid out. Made a cheat sheet with drill sizes for the wall.

2 h
NO PHOTO
2025-08-30 General › Tools and workspace

Compressor and air lines

Mounted the compressor in the corner of the garage, with a water separator and a regulator on the wall. Ran air lines to both benches with quick couplers.

2.5 h
NO PHOTO
2025-08-23 General › Tools and workspace

Tool kit arrived

The tool kit from Cleaveland came today. Unpacked everything, sorted the dimple dies and rivet sets in a drawer cabinet and labelled all the drawers. Also ordered a second set of clecos. Everyone on the forums says you c…

3 h
NO PHOTO
2025-08-16 General › Tools and workspace

Workbenches built

Built two EAA-style workbenches, 120 x 60 cm, from 2x4 and MDF tops. Same height as my hips so I can rivet without bending over. Put them on casters so I can move things around in the garage.

4.5 h