Demo You are looking at LN-DMO as its owner sees it – build log, costs, maintenance, notifications and settings. Look around freely; nothing can be changed. Start your own
LN-DMOVan's Aircraft RV-10 · build log
Tasks 2 Inspections 11
Settings What is Firstflight? Log in
Planning
Building
Final inspection
Flight test (Phase 1)
In service

Build log

74 entries

+ New entry
NO PHOTO
2025-10-04 Empennage › Vertical stabilizer

VS riveted

Riveted the skeleton, then the skin. My wife bucked for the hard-to-reach ones. Only two rivets drilled out. The VS is done!

4.5 h ✔ Inspected
NO PHOTO
2025-09-27 Empennage › Vertical stabilizer

Primer

Scuffed and cleaned all the internal parts and primed them with rattle-can primer. Let it cure overnight.

3 h ✔ Inspected
NO PHOTO
2025-09-24 Empennage › Vertical stabilizer

Deburring and dimpling

Deburred every hole and dimpled the skin with the C-frame. Machine countersunk the spar flange where the plans call for it.

3.5 h ✔ Inspected
NO PHOTO
2025-09-20 Empennage › Vertical stabilizer

VS skin match-drilled

Clecoed the skin to the skeleton and match-drilled all holes to final size. Took it apart again for deburring and dimpling.

4 h ✔ Inspected
NO PHOTO
2025-09-16 Empennage › Vertical stabilizer

VS ribs fluted and fitted

Fluted the ribs until the holes lined up with the spar flanges. Clecoed the skeleton together and it sits square on the bench.

3 h ✔ Inspected
NO PHOTO
2025-09-13 Empennage › Vertical stabilizer

VS spars

Deburred the front and rear spars and the spar doublers. Match-drilled the rear spar doubler to the spar per 6-2.

3.5 h ✔ Inspected
NO PHOTO
2025-09-07 Empennage › Receipt and inventory

Inventory done

Inventory complete. Two bags of AN470AD4-6 rivets were short, Van's will send them with the wing kit. Everything else accounted for and stored on shelves by section.

4 h
NO PHOTO
2025-09-06 Empennage › Receipt and inventory

Empennage kit arrived

The crate arrived on a truck this morning. No visible damage. Opened it and started the inventory against the packing list.

3.5 h
NO PHOTO
2025-09-04 Options › Sheet metal basics

Practice kit done

Finished the practice kit. Drilled out a few bad rivets on purpose to learn how. Feeling ready for the real parts.

2 h
NO PHOTO
2025-09-02 Options › Sheet metal basics

Practice kit, part 1

Started on the practice kit. Drilling, deburring and dimpling went fine. The squeezer is easy; the rivet gun takes some practice to keep straight.

2.5 h